Cundiff Court
Building Safety Case Information
We’ve summarised all the key safety information for you to make it as easy as possible for you to access and understand, but if you’d like to know about any of this in more detail, please just get in touch. You can email us on buildingsafety@onemanchester.co.uk to request more information.
Construction Materials
Reinforced in situ concrete column and floor slab frame with in fill cavity masonry construction including a whole building steel framed overclad roof and fascia panels and rainscreen external wall cladding system (see below for details).
The external walls construction is:
- Alucobond A2 rainscreen cladding panels over rockwool mineral insulation
- Terracotta clay tiles over mineral fibre insulation.
- Wetherby Insulated Silicone Render system and stone wool insulation.
- Wonderwall 1 Clay Brick Slip Panel Cladding System on phenolic foam insulation (ground floor only).
- Insulated spandrel panels with polyurethane foam core to a small number of windows at ground floor level.
- Recessed external walls to balconies on front (west) and rear (east) elevations are Dryvit outsulation render cladding system over expanded polystyrene insulation.
Date of latest FRA: 9th October 2024
Risk Rating: Moderate Risk
Date of next FRA: 9th October 2025
Investment Work
We carry out a regular programme of investment and improvement work to ensure all our homes and buildings are safe and pleasant places to live. We also ensure they meet the Government’s ‘Decent Homes’ standard. Previous investment work that has taken place at your building includes: